DHA Bahawalpur
Palm-lined boulevards at the edge of Cholistan.
DHA Bahawalpur
Bahawalpur, Punjab · 15 phases and sectors
What is nearby
54 places in and around the society
- Central Park (Central Family Park)Society's central park (2019); Sector C possession ceremony held here in Oct 2021
- Dancing FountainsFountain park beside the Food Park
- Mini ZooSmall zoo, listed as completed 2018
- Orchard ParkOrchard Enclave · Park of the Orchard Enclave community, listed 2025
- Palm ParkPark named in a 2026 market guide; location not stated
- Joy Land theme parkTheme park listed as upcoming (2025)
- Villa Community Commercial MarketSector D (DHA Villas) · Shops for the villa community, opened May 2022
- Alpha BroadwaySector B · 2-marla double-storey shops for sale and rent (Jan 2024)
- Capital Alpha and Downtown AlphaCommercial project listed as ongoing (Sep 2025)
- Dune Avenue CommercialCommercial strip listed as ongoing (Sep 2025)
- Sector shops (Sectors A and C)32 two-marla sector shops contracted in Aug 2024
- Skeet Shooting ClubSkeet, pistol, air-rifle and long-range shooting; registration opened Jul 2020, formally opened May 2022
- DHA ClubSector B · Club with pools, tennis and gym; listed by DHA as upcoming; Sector B per market guides
- Padel ClubInternational-standard padel club under a Jan 2026 development agreement
- Horse Riding ClubNamed in a 2026 market guide; not on DHA's own project list
- Masjid-e-Abu BakkarSector A · Sector A mosque, completed 2024
- Masjid-e-AliSector B · Sector B mosque, completed 2024
- Villa Community MosqueSector D (DHA Villas) · First mosque in the society, opened 13 May 2022
- NUML campus (planned)MoU signed for a campus in the education enclave; not yet built
- NDU campus (planned)MoU signed for a campus in the education enclave; not yet built
- UCP campus, Yazman RoadPrivate university campus about 5 minutes away, outside DHA
- Takmeel SquareSector N · 14-acre shop-cum-office project at the MB-1 / MB-2 junction
- Pelican MallSector C · 16-storey mall and hotel on Jinnah Avenue; earth-breaking 25 Mar 2022; excavation reported 70-80% done early 2026
- Roots IVY SchoolSignature school branch opened Sep 2020
- Quills of WisdomListed by DHA as a completed project (2020); appears to be an education facility
- Health One Global Hospital (planned)Health city agreement Mar 2022: 500-750 beds, nursing, dental and medical colleges, children's hospital; listed as upcoming
- Cancer hospital site (planned)50 acres earmarked in 2019 for a cancer hospital; no construction found
- PSO petrol pumpFuel station with mart, food court, car wash and tyre/lube; listed as completed 2025
- Second petrol pump (Main Boulevard)Sector F · Double-storey station with lube change, service station and food court; MoU Jun 2022
- Food ParkFood court area (2019) near the banquet hall and dancing fountain
- Golf course (planned)19-hole course promised in marketing material; no build status found
- CMH Institute of Medical Sciences (CIMS)Army medical college inside DHA, listed as completed (2025)
- Polyclinic and Diagnostic CentreContract signed Jul 2026
- 132/11 kV grid stationDHA's own grid station, under construction (2025)
- Jinnah Gate (main entrance, Jinnah Avenue)Main entrance from the Yazman Road side; gate completed 2020
- Main Gate, Iqbal AvenueSecond main gate; listed as completed 2024
- Iqbal AvenueMain avenue; listed as completed 2024, with a bridge over the APE Canal (2022)
- Jinnah Avenue (MB-2)Main avenue; the DHA head office and Pelican Mall sit on it
- DHA head office complexSector B · Main office; energised Dec 2021; runs on a 300 kW pilot solar plant (Nov 2021)
- Basketball and Futsal CourtSports courts completed Feb 2022
- Cricket GroundCommunity cricket ground, listed as completed
- International Cricket Stadium (planned)Listed by DHA as upcoming (Sep 2025)
- +12 more
Utilities
Charges
As of the dates shown; ZN confirms current amounts
- Possession fee, residentialRs 750 per marla2026-01
- Possession fee, commercialRs 2,500 per marla2026-01
- Site plan feeRs 2,0002026-01
- Drawing scrutiny fee, residentialRs 6 per sq ft of covered area2026-01
- Drawing scrutiny fee, commercialRs 16/sq ft (5-8 marla), Rs 12/sq ft (4 marla and below), Rs 30/sq ft (2-marla shop)2026-01
- Fire safety drawing feeRs 2/sq ft residential, Rs 8/sq ft commercial2026-01
- Structure and MEP drawing scrutinyRs 1/sq ft each residential, Rs 3/sq ft each commercial2026-01
- Water connection feeRs 10,0002026-01
- Sewer connection feeRs 5,0002026-01
- Debris removal charges2 kanal Rs 60,000; 1 kanal Rs 40,000; 10 marla and below Rs 20,000; commercial Rs 10,000 per marla2026-01
- House completion feeRs 7,000 residential; Rs 15,000 per marla commercial2026-01
- Revised drawing chargesRs 3/sq ft plus Rs 8/sq ft for added area (residential); Rs 10 plus Rs 14 (commercial)2026-01
- Water charges during constructionRs 15 per sq ft of covered area2026-01
- Park-facing / corner plot charge10% of development charges each; corner and park-facing 15%2026-01
Building rules
Key construction rules; ZN checks the latest rules for your plot before you build
1 kanal (50 x 90 ft): ground floor up to 2,703 sq ft (60%), first floor up to 2,162 sq ft (80% of ground), total 5,262 sq ft; floor area ratio 1.0
Two building height limits are listed: 39 ft and 32 ft
Allowed storeys: basement + ground + first floor; roof stair room (mumty) up to 300 sq ft; parapet 36 in
1 kanal: front 15 ft 9 in, rear 5 ft 4.5 in, left and right 5 ft 4.5 in each
Basement may cover up to 100% of the allowed covered area (excluding the porch), leaving 5 ft on the dead-wall side; clear passage at least 2 ft 6 in; a basement undertaking is needed with drawings
Maximum 7 ft above the crown of the road, plus a 2 ft steel grill, fence or louvres on top; coping towards the road may project up to 4 in
Construction must start within 3 years of the date the area is opened for possession, or a non-construction penalty applies
House must be finished within 1.5 years of drawing approval, with water and sewer connections taken; violation charges are then levied monthly
Approved drawings stay valid for 1 year; after that fresh approval is needed
Drawings by a licensed architect and a registered structural engineer: stability certificates, 3 prints plus AutoCAD file, allotment letter, site plan, CNIC, undertakings and a soil bearing-capacity report; approval in about 2-3 working days
No occupancy before the completion certificate; a house cannot be transferred without it; issued about 2-3 working days after inspection; a fine applies if not obtained in time
Late / non-completion fee of Rs 5,000 per month per house or building
No commercial or semi-commercial activity in residential areas; vacant plots and open areas cannot be used for functions or gatherings; political, religious or sectarian flags not allowed
Up to 4 plots may be amalgamated (side by side only)
Car porch: 1 kanal gets one (corner plot two), max 18 x 18 ft; one gate (corner plot two), 24 ft / 15 ft wide
Guard room up to 6 x 6 ft and 8 ft high beside the main gate; 2-4 trees must be planted; at least one fire extinguisher per house; smart meters and net metering required
Only one water connection per plot and no pump on the supply line; one underground tank allowed; car washing on the road not allowed
Construction progress yardstick for incentives: grey structure counts 35%, finishing 65%
Development-charge waivers under Construction Incentive-6 (Sectors A, B, C, D, F, N, Orchard Enclave, 1 Jan 2026-30 Apr 2027) only on 100% completion; already started houses excluded
Timeline
Launches, ballots and possession announcements
- 2026-101,659 buildings
950 buildings completed and 709 under construction; 2,178 units projected
- 2026-10Defence Gardenia offer · Defence Gardenia
First 150 villas on a 3-year plan with possession in 2 years; prices rise after 31 Oct 2026
- 2026-07Polyclinic
Contract for a polyclinic and diagnostic centre
- 2026-02Askari Bank finance
Housing finance MoU for members
- 2026-01Construction Incentive-6
Up to 100% development-charge waiver for completing in A, B, C, D, F, N and Orchard Enclave by 30 Apr 2027; 2026 declared year of livability
- 2026-01Padel club and bank tie-ups
Padel club agreement; UBL housing finance; HBL online bill payment
- 2024-11One-window possession
Possession handover in 1-2 days, drawing approval in 1 day
- 2024-09Gas in D, F, N · Sector N
Sui gas commissioned for Sectors D, F and N
- 2024-05Construction incentive
100% waiver on development charges for building in Sectors A, B, C (May 2024-Apr 2025, later to Aug 2025)
- 2023-09Orchard Enclave launch · Orchard Enclave
Orchard Enclave unveiled 12 Sep 2023; development began Nov 2023
- 2023-08Sector C energised · Sector C
Electricity switched on in Sector C
- 2023-07Location Ballot 2023
Location ballot for remaining files held (allottees later called the July 2023 ballot); Yazman Access Road opened
- 2022-12Banquet hall
Grand Rohi banquet hall inaugurated
- 2022-09Sectors A-B energised · Sector B
Electricity switched on in Sectors A and B
- 2022-05Sectors E and G groundbreaking · Sector E
Development started in Sectors E and G (13 May 2022); villa mosque and market opened
- 2022-03Pelican Mall · Sector C
Earth-breaking of the 16-storey Pelican Mall on 25 Mar 2022
- 2022-01Gas connected
Main gas supply connected to the society
- 2021-12Ballot and first residents
Ballot of new instalment plots (7 Dec); main office and villas energised; first 13 families moved in (Sectors A-B); Dealers Enclave opened
- 2021-10Sector C possession · Sector C
10-marla plots in Sector C handed over on 22 Oct 2021
- 2020-09Possession ceremony · Sector A
Possession of Sectors A and B plots and 9-marla villas; 100% development-charge waiver for quick builders
