DHA Gujranwala

A new society in the green plains of central Punjab.

All DHAs

DHA Gujranwala

Gujranwala, Punjab · 20 phases and sectors

What is nearby

46 places in and around the society

Markets 8 Parks 4 Schools 4 Fuel stations 4 Mosques 3 Grid stations 2 Food streets 2 Malls 2 Hospitals 2 Graveyards 1 Other places 14
Markets
  • Villas Commercial Shops
    Rachna Villas · Shops beside the villas; developed
  • Sector C Commercial
    Sector C · Sector commercial area with 4-marla shops
  • Sector G Commercial
    Sector G · Sector commercial area with 4-marla shops
  • Sector K Main Commercial
    Sector K · Main commercial strip with its own published map
  • Sector L Main Commercial
    Sector L · Main commercial strip with its own published map
  • Commercial Zone 3
    Commercial Zone 3 · Commercial plots on the south side of the Main Boulevard; handover pending
  • Commercial Zone 1
    Commercial Zone 1 · 4- and 8-marla commercial plots facing GT Road; possession opened 2022
  • Commercial Zone 2
    Commercial Zone 2 (North & South) · 4- and 8-marla commercial plots at the Main Entrance; possession opened 2022
Parks
  • Mini Zoo
    Listed as a developed facility
  • Family Park (Villas)
    Rachna Villas · Family park listed with the villas as developed
  • ARY Laguna Crystal Lagoon
    ARY Laguna DHA Gujranwala · Man-made lagoon; groundbreaking Aug 2023, reported in water-filling stage Apr 2026
  • Sectors K & L Theme Park
    Sector K · Planned for the K/L area (area guide); not built
Schools
  • Sector G Primary School
    Sector G · Primary school reported operational in 2026 (market sources)
  • Sector C High School
    Sector C · High school listed as built in an area guide
  • Beaconhouse School (joint venture)
    Joint venture signed Mar 2025; campus not yet reported open
  • Sectors K & L Education Complex
    Sector L · Planned for the K/L area (area guide); not built
Fuel stations
  • Sector C Petrol Pump
    Sector C · Petrol pump site listed in an area guide
  • Zoom Service Station
    Sector A · Fuel and service station agreed Oct 2024, near Rachna Villas
  • PSO Service Station
    Joint venture signed Jun 2025; site not stated; upcoming
  • NLC Petrol Pump
    On Chenab Gate Road at the southern edge, outside the society
Mosques
  • Villas Mosque
    Rachna Villas · Mosque serving the villas; developed
  • Executive Block Mosque
    Executive Block · Listed as still developing
  • Sector G Mosque
    Sector G · Reported operational by market sources in 2026
Grid stations
  • 132 kV Grid Station
    Inaugurated Oct 2024 and described as fully energised; exact sector not stated
  • Sector C Grid Station
    Sector C · Smaller grid station listed for Sector C in an area guide
Food streets
  • Cafe Caven In
    Cafe listed as a developed facility
  • Food Eateries
    Food court area listed as developed
Malls
  • Mixed-use Commercial Hub (161.8 kanal)
    Memorandum signed Dec 2025 with a listed developer; site not stated
  • DHA Mall
    Put out to tender in May 2022; no completion reported
Hospitals
  • Sectors K & L Hospital
    Sector L · Planned for the K/L area (area guide); not built
  • CMH Gujranwala
    Military hospital in Gujranwala Cantt, about 4 km south of the society
Graveyards
  • Sector C Graveyard
    Sector C · Graveyard listed in an area guide
Other places
  • DHA Main Gate
    Commercial Zone 2 (North & South) · Main entrance on GT Road at the start of the 200-ft Main Boulevard; developed
  • Northern Gate
    Commercial Zone 1 · Second entrance from GT Road on the 150-ft Northern Boulevard; developed
  • Chenab Gate
    South-east entrance on Chenab Gate Road with a military police check post; edge of the society
  • DHA Office Complex
    Head office building on the Main Boulevard; listed as developed
  • Filtration Plant
    Water filtration plant listed as developed
  • Overhead Water Tank
    100,000-gallon overhead tank under construction in Feb 2021
  • Wellness Space
    Listed as a developed facility
  • Lil Champs
    Children's facility listed as developed
  • +6 more

Utilities

Electricity
DHA own 132 kV grid station
Grid station inaugurated Oct 2024 with underground cabling; the outside supplying company is not stated
Water
DHA own
DHA network with overhead tank and filtration plant; connection approved by DHA after completion
Sewerage
DHA own
Houses connect to DHA main lines after completion; septic tank required during construction
Security
DHA (army-administered)
Gated entrances with a military police check post at the south-east gate
Gas
Not confirmed
Gas is listed as a service in guides but no provider or connection status was found

Charges

As of the dates shown; ZN confirms current amounts

  • Site plan applicationRs 5,0002022-10
  • Possession charges, residential (per kanal)Rs 15,0002022-10
  • Possession charges, commercial (per 4 marla)Rs 10,0002022-10
  • Demarcation, up to 1 kanalRs 15,0002022-10
  • Demarcation, above 1 kanal / commercialRs 20,0002022-10
  • Drawing security fee, residential (per sq ft of covered area)Rs 32022-10
  • Drawing security fee, commercial (per sq ft): sector shops / 4-8 marla / 8 marla and aboveRs 15 / Rs 20 / Rs 252022-10
  • Non-construction (non-utilisation) fee, up to 10 marlaRs 15,0002022-10
  • Non-construction (non-utilisation) fee, 1 kanalRs 30,0002022-10
  • Non-construction (non-utilisation) fee, 2 kanalRs 60,0002022-10
  • Non-construction fee, commercial (per marla)Rs 20,000 (4 marla Rs 80,000; 8 marla Rs 160,000)2022-10
  • Sub-division of 2 kanal into 1 kanal plotsRs 40,0002022-10
  • Water connectionRs 50,0002022-10
  • Sewerage connectionRs 90,0002022-10

Building rules

Key construction rules; ZN checks the latest rules for your plot before you build

Height2022

Residential houses of every plot size: maximum height 35 ft from the crown of the road; lift machine room may go to 41 ft

Height2022

Residential: ground floor plus first floor only; a second floor is not allowed. Room ceiling height 9.5 ft minimum, 12 ft maximum

Covered area2022

First floor may cover at most 75% of the permissible ground-floor area; on 5 marla plots the first floor may cover 100% of the ground floor

Setbacks2022

Minimum clear spaces (front / rear / side): 5 marla 5 ft / 3 ft / 3 ft; 6 marla 6 ft 9 in / 3 ft / 3 ft; 8 marla 8 ft / 4 ft / 4 ft; 10 marla 10 ft 9 in / 5 ft 4.5 in / 5 ft 4.5 in; 1 kanal 15 ft 9 in / 5 ft 4.5 in / 5 ft 4.5 in; 2 kanal 20 ft 9 in / 8 ft 4.5 in / 5 ft 4.5 in on both sides

Setbacks2022

No construction in clear spaces except basement stair (2.5 ft), underground tank, drains, septic tank and sewer line; servant quarters and guard rooms must be inside the main building

Basement2022

One basement storey allowed under the allowable ground-floor footprint; basement height up to 10 ft; ground-floor plinth 3.5 ft above road with a basement (1.5 ft without); RCC retaining walls; walls next to existing houses finished within 45-60 days of digging

Boundary wall2022

Maximum 7 ft from the crown of the adjacent road; an electric fence up to 2 ft may be added on a common wall with the neighbour's NOC (total 9 ft); concertina wire not allowed

Construction period2022

Construction must start within 3 years of the area being opened for possession and the house must be finished within 2 years of drawing approval; approved drawings are valid for 2 years

Non-construction penalty2022

No penalty within 3 years of possession opening; a buyer who purchases after that gets a 24-month grace period from transfer; families of martyrs are exempt

Map approval2022

Steps: clear dues, site plan, soil test by the DHA lab, drawings by an approved architect, demarcation (which is the construction permit), stage inspections (9 stages), then water and sewer connection

Map approval2022

For residential plots of 1 kanal and above and all commercial plots the contractor must be registered with the engineering/planning councils and approved by DHA

Completion certificate2022

Issued normally within 20 working days if no violation is found; the owner must obtain it within 3 years of drawing approval; sewer opening date counts as completion date

Commercial use2022

Offices, parlours, tuition centres, clinics, hostels and guest houses are not allowed in residential buildings

Height2022

Commercial 4-20 marla plots: basement, ground, mezzanine and four floors, up to 80 ft (lift room to 86 ft). Sector shops: ground and first floor, up to 25 ft. Larger plots: case by case (FAR about 1:5)

Covered area2022

Commercial buildings: basement and upper floors 100% of plot, mezzanine 70% of shop area; sector shops 100% ground floor and 75% first floor

Other2022

A 2 kanal residential plot may be split into two 1 kanal plots; two residential plots may be joined

Other2025-06

Selling individual floors of 8-marla commercial plazas is not allowed

Other2022

Only fixed CCTV cameras allowed on houses (no PTZ cameras); at least two trees in the front lawn

Timeline

Launches, ballots and possession announcements

  1. 2026-07
    Sector maps updated · Sector C

    Updated sector maps published for Sector C and Sectors K and L

  2. 2026-04
    Smart Location Ballot (4th)

    Fourth location ballot listed for 2026; market sources date it to 30 Apr 2026

  3. 2025-12
    Commercial hub agreement

    Memorandum for a 161.8 kanal mixed-use commercial hub

  4. 2025-06
    Fuel station joint venture

    Agreement with the state oil company for a service station

  5. 2025-05
    Surcharge waiver · Sector M

    Surcharge on development charges waived till 30 Jun 2025 for Sector M and Sector K blocks K4-K9

  6. 2025-03
    School joint venture

    Joint venture signed with a national school chain

  7. 2025-03
    InnoVista Rachna active

    IT coworking space hosting business and freelancer delegations

  8. 2025-01
    Transfer office moved · Dealers' Enclave (CZ-4)

    Transfer office relocated inside the society

  9. 2024-10
    Location ballot

    Location ballot for residential and commercial plots

  10. 2024-10
    132 kV grid station inaugurated

    Grid station opened and solar street lights installed

  11. 2024-10
    Service station agreement · Sector A

    Fuel and service station agreed near Rachna Villas

  12. 2023-11
    Possession Sectors C and G · Sector C

    Possession handed over with up to 100% development-charge discount for early builders

  13. 2023-08
    ARY Laguna groundbreaking · ARY Laguna DHA Gujranwala

    Ground broken for the lagoon project

  14. 2022-06
    Executive Block ballot · Executive Block

    Location ballot for 1 and 2 kanal plots, 15% kept for overseas members

  15. 2022-05
    Commercial possession · Commercial Zone 1

    Possession opened for 4 and 8 marla plots in Commercial Zones 1 and 2

  16. 2022-05
    Tenders announced

    Sectors K and L, Executive Block, head office, DHA Mall, Sector F, Southern Boulevard and 132 kV grid station

  17. 2022-02
    Development charges announced

    Payment schedule for open ballot files, quarterly to Oct 2027

  18. 2021-10
    First location ballot (Phase 1)

    Location ballot for all 5 marla files and fully paid 10 marla and 1 kanal files

  19. 2021-06
    Villas, apartments and commercial booking

    Booking opened for villas, apartments and 4/8 marla commercial plots

  20. 2021-02
    Water works

    100,000-gallon overhead tank under construction; underground water lines nearly complete