46 places in and around the society
- Villas Commercial ShopsRachna Villas · Shops beside the villas; developed
- Sector C CommercialSector C · Sector commercial area with 4-marla shops
- Sector G CommercialSector G · Sector commercial area with 4-marla shops
- Sector K Main CommercialSector K · Main commercial strip with its own published map
- Sector L Main CommercialSector L · Main commercial strip with its own published map
- Commercial Zone 3Commercial Zone 3 · Commercial plots on the south side of the Main Boulevard; handover pending
- Commercial Zone 1Commercial Zone 1 · 4- and 8-marla commercial plots facing GT Road; possession opened 2022
- Commercial Zone 2Commercial Zone 2 (North & South) · 4- and 8-marla commercial plots at the Main Entrance; possession opened 2022
- Mini ZooListed as a developed facility
- Family Park (Villas)Rachna Villas · Family park listed with the villas as developed
- ARY Laguna Crystal LagoonARY Laguna DHA Gujranwala · Man-made lagoon; groundbreaking Aug 2023, reported in water-filling stage Apr 2026
- Sectors K & L Theme ParkSector K · Planned for the K/L area (area guide); not built
- Sector G Primary SchoolSector G · Primary school reported operational in 2026 (market sources)
- Sector C High SchoolSector C · High school listed as built in an area guide
- Beaconhouse School (joint venture)Joint venture signed Mar 2025; campus not yet reported open
- Sectors K & L Education ComplexSector L · Planned for the K/L area (area guide); not built
- Sector C Petrol PumpSector C · Petrol pump site listed in an area guide
- Zoom Service StationSector A · Fuel and service station agreed Oct 2024, near Rachna Villas
- PSO Service StationJoint venture signed Jun 2025; site not stated; upcoming
- NLC Petrol PumpOn Chenab Gate Road at the southern edge, outside the society
- Villas MosqueRachna Villas · Mosque serving the villas; developed
- Executive Block MosqueExecutive Block · Listed as still developing
- Sector G MosqueSector G · Reported operational by market sources in 2026
- 132 kV Grid StationInaugurated Oct 2024 and described as fully energised; exact sector not stated
- Sector C Grid StationSector C · Smaller grid station listed for Sector C in an area guide
- Cafe Caven InCafe listed as a developed facility
- Food EateriesFood court area listed as developed
- Mixed-use Commercial Hub (161.8 kanal)Memorandum signed Dec 2025 with a listed developer; site not stated
- DHA MallPut out to tender in May 2022; no completion reported
- Sectors K & L HospitalSector L · Planned for the K/L area (area guide); not built
- CMH GujranwalaMilitary hospital in Gujranwala Cantt, about 4 km south of the society
- Sector C GraveyardSector C · Graveyard listed in an area guide
- DHA Main GateCommercial Zone 2 (North & South) · Main entrance on GT Road at the start of the 200-ft Main Boulevard; developed
- Northern GateCommercial Zone 1 · Second entrance from GT Road on the 150-ft Northern Boulevard; developed
- Chenab GateSouth-east entrance on Chenab Gate Road with a military police check post; edge of the society
- DHA Office ComplexHead office building on the Main Boulevard; listed as developed
- Filtration PlantWater filtration plant listed as developed
- Overhead Water Tank100,000-gallon overhead tank under construction in Feb 2021
- Wellness SpaceListed as a developed facility
- Lil ChampsChildren's facility listed as developed
- +6 more
Utilities
Charges
As of the dates shown; ZN confirms current amounts
- Site plan applicationRs 5,0002022-10
- Possession charges, residential (per kanal)Rs 15,0002022-10
- Possession charges, commercial (per 4 marla)Rs 10,0002022-10
- Demarcation, up to 1 kanalRs 15,0002022-10
- Demarcation, above 1 kanal / commercialRs 20,0002022-10
- Drawing security fee, residential (per sq ft of covered area)Rs 32022-10
- Drawing security fee, commercial (per sq ft): sector shops / 4-8 marla / 8 marla and aboveRs 15 / Rs 20 / Rs 252022-10
- Non-construction (non-utilisation) fee, up to 10 marlaRs 15,0002022-10
- Non-construction (non-utilisation) fee, 1 kanalRs 30,0002022-10
- Non-construction (non-utilisation) fee, 2 kanalRs 60,0002022-10
- Non-construction fee, commercial (per marla)Rs 20,000 (4 marla Rs 80,000; 8 marla Rs 160,000)2022-10
- Sub-division of 2 kanal into 1 kanal plotsRs 40,0002022-10
- Water connectionRs 50,0002022-10
- Sewerage connectionRs 90,0002022-10
Building rules
Key construction rules; ZN checks the latest rules for your plot before you build
Residential houses of every plot size: maximum height 35 ft from the crown of the road; lift machine room may go to 41 ft
Residential: ground floor plus first floor only; a second floor is not allowed. Room ceiling height 9.5 ft minimum, 12 ft maximum
First floor may cover at most 75% of the permissible ground-floor area; on 5 marla plots the first floor may cover 100% of the ground floor
Minimum clear spaces (front / rear / side): 5 marla 5 ft / 3 ft / 3 ft; 6 marla 6 ft 9 in / 3 ft / 3 ft; 8 marla 8 ft / 4 ft / 4 ft; 10 marla 10 ft 9 in / 5 ft 4.5 in / 5 ft 4.5 in; 1 kanal 15 ft 9 in / 5 ft 4.5 in / 5 ft 4.5 in; 2 kanal 20 ft 9 in / 8 ft 4.5 in / 5 ft 4.5 in on both sides
No construction in clear spaces except basement stair (2.5 ft), underground tank, drains, septic tank and sewer line; servant quarters and guard rooms must be inside the main building
One basement storey allowed under the allowable ground-floor footprint; basement height up to 10 ft; ground-floor plinth 3.5 ft above road with a basement (1.5 ft without); RCC retaining walls; walls next to existing houses finished within 45-60 days of digging
Maximum 7 ft from the crown of the adjacent road; an electric fence up to 2 ft may be added on a common wall with the neighbour's NOC (total 9 ft); concertina wire not allowed
Construction must start within 3 years of the area being opened for possession and the house must be finished within 2 years of drawing approval; approved drawings are valid for 2 years
No penalty within 3 years of possession opening; a buyer who purchases after that gets a 24-month grace period from transfer; families of martyrs are exempt
Steps: clear dues, site plan, soil test by the DHA lab, drawings by an approved architect, demarcation (which is the construction permit), stage inspections (9 stages), then water and sewer connection
For residential plots of 1 kanal and above and all commercial plots the contractor must be registered with the engineering/planning councils and approved by DHA
Issued normally within 20 working days if no violation is found; the owner must obtain it within 3 years of drawing approval; sewer opening date counts as completion date
Offices, parlours, tuition centres, clinics, hostels and guest houses are not allowed in residential buildings
Commercial 4-20 marla plots: basement, ground, mezzanine and four floors, up to 80 ft (lift room to 86 ft). Sector shops: ground and first floor, up to 25 ft. Larger plots: case by case (FAR about 1:5)
Commercial buildings: basement and upper floors 100% of plot, mezzanine 70% of shop area; sector shops 100% ground floor and 75% first floor
A 2 kanal residential plot may be split into two 1 kanal plots; two residential plots may be joined
Selling individual floors of 8-marla commercial plazas is not allowed
Only fixed CCTV cameras allowed on houses (no PTZ cameras); at least two trees in the front lawn
Timeline
Launches, ballots and possession announcements
- 2026-07Sector maps updated · Sector C
Updated sector maps published for Sector C and Sectors K and L
- 2026-04Smart Location Ballot (4th)
Fourth location ballot listed for 2026; market sources date it to 30 Apr 2026
- 2025-12Commercial hub agreement
Memorandum for a 161.8 kanal mixed-use commercial hub
- 2025-06Fuel station joint venture
Agreement with the state oil company for a service station
- 2025-05Surcharge waiver · Sector M
Surcharge on development charges waived till 30 Jun 2025 for Sector M and Sector K blocks K4-K9
- 2025-03School joint venture
Joint venture signed with a national school chain
- 2025-03InnoVista Rachna active
IT coworking space hosting business and freelancer delegations
- 2025-01Transfer office moved · Dealers' Enclave (CZ-4)
Transfer office relocated inside the society
- 2024-10Location ballot
Location ballot for residential and commercial plots
- 2024-10132 kV grid station inaugurated
Grid station opened and solar street lights installed
- 2024-10Service station agreement · Sector A
Fuel and service station agreed near Rachna Villas
- 2023-11Possession Sectors C and G · Sector C
Possession handed over with up to 100% development-charge discount for early builders
- 2023-08ARY Laguna groundbreaking · ARY Laguna DHA Gujranwala
Ground broken for the lagoon project
- 2022-06Executive Block ballot · Executive Block
Location ballot for 1 and 2 kanal plots, 15% kept for overseas members
- 2022-05Commercial possession · Commercial Zone 1
Possession opened for 4 and 8 marla plots in Commercial Zones 1 and 2
- 2022-05Tenders announced
Sectors K and L, Executive Block, head office, DHA Mall, Sector F, Southern Boulevard and 132 kV grid station
- 2022-02Development charges announced
Payment schedule for open ballot files, quarterly to Oct 2027
- 2021-10First location ballot (Phase 1)
Location ballot for all 5 marla files and fully paid 10 marla and 1 kanal files
- 2021-06Villas, apartments and commercial booking
Booking opened for villas, apartments and 4/8 marla commercial plots
- 2021-02Water works
100,000-gallon overhead tank under construction; underground water lines nearly complete