DHA Peshawar
Modern sectors with the Khyber mountains on the horizon.
DHA Peshawar
Peshawar, Khyber Pakhtunkhwa · 7 phases and sectors
What is nearby
54 places in and around the society
- Sector A park (south)Sector A · One of several sector parks; Sector A parks listed as completed
- Sector A park (west)Sector A · Sector park near the western edge
- Sector A2 parkSector A · Park in the A2 sub-area
- Sector B parkSector B · One of three parks in Sector B
- Sector C parkSector C · One of three parks in Sector C
- Prism park and recreational areaSector Prism (D Prism) · Green area beside the Prism apartment blocks
- Adventure ArenaOutdoor activity park (zipline, ATV track); operational
- DHA water streamLandscaped water channel; completed project
- Sector A mosqueSector A · Sector mosque on the official layout
- Sector B mosqueSector B · Sector mosque
- Sector C mosqueSector C · Sector mosque
- Sector Prism mosque (south)Sector Prism (D Prism) · One of two mosque sites in Prism
- Sector Prism mosque (north)Sector Prism (D Prism) · Second mosque site in Prism
- Jamia MasjidFirst central mosque, opened to the public in 2022
- Sector A school siteSector A · School plot on the official sector layout
- Sector B school siteSector B · School plot on the official sector layout
- Sector C school siteSector C · School plot on the official sector layout
- Education institute site (Central Commercial District)Nasir Bagh Commercial / Central Commercial District · Education plot on the commercial layout; an international-standard education institute is listed as completed, link to this plot not confirmed
- Future World School & College (Roots Millennium)Private school campus inaugurated in 2024
- Sector A mini martSector A · Neighbourhood mart next to the sector mosque
- B MartSector B · Sector B mini mart; a clinic operates here
- Sector C mini martSector C · Neighbourhood mart
- Commercial Zone ASector A · Commercial zone in Sector A; development started 2024
- Clinic at B MartSector B · Basic clinic inside the Sector B mart
- Health Center (planned)Health centre listed as an upcoming project; no hospital inside yet
- DHA gymGym opened to the public
- Riding clubHorse riding club listed as an amenity by a property portal
- Rescue 1122 centreEmergency rescue and fire service centre inaugurated in the society
- Nasir Bagh Police StationPolice station on the Nasir Bagh Road side; listed as a completed project
- PSO filling stationFuel station operational since 2023
- Chai ShaiCafe-restaurant among the listed in-society outlets
- D MallPlanned mixed-use tower: 3 basements, lower ground and 13 floors with shops, food court, offices and 1-3 bed flats; unit ballot held Dec 2021
- Grid stationListed as an amenity by a property portal; not confirmed on official pages
- GraveyardListed as an amenity by a property portal; not confirmed on official pages
- Sector A Sports ArenaSector A · Sports arena project under construction
- Prism apartment blocksSector Prism (D Prism) · Five apartment blocks on the official layout
- Prism ComplexSector Prism (D Prism) · Completed DHA complex in Sector Prism
- DHA facilities site (Northern Bypass side)Sector Prism (D Prism) · DHA facilities plot next to the main gate
- Northern Bypass main entrance gateSector Prism (D Prism) · Main gate on the Northern Bypass, east side of Prism; built 2022
- D ChowkRoundabout on the Northern Bypass at the Prism end
- Pakistan ChowkCentral roundabout where Sectors A, B and C meet; completed project
- Nerve CenterSmart-city monitoring and control centre, inaugurated 2025
- +12 more
Utilities
Charges
As of the dates shown; ZN confirms current amounts
- Original development charges paid (instalment plan to Feb 2021) - 125 / 250 / 500 / 1,000 sq ydRs 965,330 / Rs 1,625,000 / Rs 2,250,000 / Rs 3,765,0002021-02
- Additional development charges demanded - 125 / 250 / 500 / 1,000 sq yd (about 39-41% extra; challenged in court, cancellations stayed Dec 2024)Rs 380,000 / Rs 660,000 / Rs 930,000 / Rs 1,530,0002024-03
- Surcharge on late development charges - service-benefit / land owner or investor / Penta Square12% / 14% / 6% per year
- Drawing approval - commercial plotsRs 30,000 per marla (Rs 120,000 for 4 marla, Rs 600,000 for 1 kanal)
- Amalgamation of commercial plotsRs 15,000 per marla of added area
- Site plan and demarcation (commercial schedule)Rs 20,000
- Permanent water / sewerage connection (commercial schedule)Rs 20,000
- Site inspections and completion certificate (commercial schedule)Rs 50,000
- Security charges (commercial schedule)Rs 10,000 per year
- Refundable construction security fee - 400 sq yd and above / below 400 sq ydRs 50,000 / Rs 30,000
- Fine for demarcation violation (commercial)Rs 25,000 per marla
- Late completion charges - commercial buildingsRs 75,000 per month
- Debris removal - commercial plots up to 8 marla / 8-16 marla / 16-32 marla / above 32 marlaRs 40,000 / Rs 60,000 / Rs 90,000 / Rs 5,000 per marla
- Corner plot charge on direct sale of location plots10% of launch price plus development charges
Building rules
Key construction rules; ZN checks the latest rules for your plot before you build
Ground-floor coverage including car porch: up to 6 marla 85%; above 6 to 9 marla 75%; above 9 to 15 marla 70%; above 15 to 25 marla 68%; above 25 to 35 marla 65%; above 35 to 60 marla 60%; above 60 marla 55%. First floor follows the ground-floor footprint.
Front/rear/side open spaces (ft): up to 6 marla 5/3/none; 6-9 marla 7/3/3; 9-15 marla 10/5/5; 15-25 marla 15/7/5 plus 5 on the porch side; 25-35 marla 18/10/6/6; 35-60 marla 20/12/8/8; above 60 marla 30/15/10/10.
For 1-kanal plots the rear open space is relaxed from 7 ft to 5 ft (front 15 ft, sides 5 ft each).
Front setback on standard plots can be relaxed by up to 1 ft (up to 10 marla) or 2 ft (10 marla and above) on payment of regularisation charges.
Stairs are not allowed inside the compulsory open spaces; they must be built inside the building line.
Houses are basement + ground + one floor. Building height including top roof slab 22.5-28.5 ft; overall height with stair hall 30-37 ft; plinth 1-3.5 ft above road level; parapet 3-4 ft.
Maximum building height is 37 ft. A lift machine room may get up to 7 ft extra (44 ft) with technical approval; beyond 41 ft after lift installation a fine of Rs 100,000 per extra inch applies or the lift must be changed.
Solar panels may not rise above mumty level (37 ft), relaxable to 42 ft; on a mumty or overhead tank they may sit at most 4 ft high. System size is capped at 150% of sanctioned load (about 7.5 kW for 5 marla up to 23 kW for 2 kanal); extra panels are removed with a Rs 100,000 fine per panel.
Mumty (stair tower) covered area: up to 5 marla 200 sq ft; up to 8 marla 200 sq ft (extendable to 250); up to 10 marla 250 (to 300); up to 1 kanal 300 (to 400); 2 kanal and above 400 (to 700). Overhead tanks are not allowed on the mumty.
A basement is allowed within the ground-floor footprint; a second basement only if ground conditions justify it. Clear height at least 8 ft 6 in; walls next to completed houses must be finished within 15 days of digging; RCC retaining walls; parking allowed; no commercial use; front open space must not be dug.
Boundary wall height from road level 5.5-8 ft. A 2 ft iron barrier on top may be allowed with extra charges. Electric fencing up to 2 ft above the wall is allowed with prior approval (not on roofs), low-voltage pulsed current only.
Construction must start within 1 year and a house must be completed within 2.5 years of drawing approval (commercial buildings within 4 years). One extension of up to 1 year may be given if applied for a month before the deadline, and a second in extreme cases with late-completion penalty.
Commercial plots not completed within 4 years pay a yearly fine of Rs 5,000 per marla (Rs 20,000 for 4 marla, Rs 100,000 for 1 kanal). A separate yearly non-utilisation fee of Rs 30,000 per marla applies to commercial plots and Rs 40,000 per marla to sector shops.
Steps: possession NOC and demarcation, then drawings with owner undertaking and dues, architect, engineer and structural-soundness certificates; construction NOC is issued within about two months. Structural design and vetting are compulsory for every house.
A possession NOC stays valid for 6 months before construction starts; all possession NOCs issued before 30 Aug 2024 were cancelled.
Completion plans (5 sets) must be submitted within 30 days of finishing the work; the building may not be occupied before completion approval. Late submission draws a penalty.
No shops, offices, godowns, parlours, tuition centres, clubs, guest houses or hostels in residential houses, and no regular use as a place of worship or for functions. Residential-to-commercial conversion is only allowed under a notified area-wide policy after a public notice.
Sector and neighbourhood commercial buildings may go up to basement + ground + 3 floors, with a maximum height of 65 ft.
Up to four 1-kanal plots sharing a side can be annexed under one owner. Annexed plots stay lawns with only temporary structures up to 10 ft; a swimming pool (plot 4,500 sq ft or more, max 40 x 20 x 6.5 ft) needs a Rs 300,000 approval. Annexation lapses if either plot is sold separately.
Unauthorised permanent construction on an annexed plot is fined Rs 500,000 plus demolition; unauthorised temporary works Rs 250,000.
Extra land next to a plot is sold at market price if built on, 30% of market price if only walled, or Rs 1,500 per sq ft as outside lawn; any piece over 2,275 sq ft becomes a separate DHA plot.
Plots under 95% of their category size get proportionate bylaw relaxation instead of money compensation.
Residential plots can be amalgamated up to 4 kanal and commercial plots up to 32 marla. Construction without approval is demolished at the owner's cost if not regularised within 3 months.
Timeline
Launches, ballots and possession announcements
- 2026-09Ballot 2026
Ballot on 10 Sep 2026 for affidavit files and intimation letters issued by 5 Sep 2026 with dues cleared
- 2026Amended bylaws
Policies on annexation, solar, electric fences, lift height, extra land and undersized plots
- 2025Sector E groundbreaking · Sectors D, E, F, H, I, J
Development of Sector E started
- 2025Nerve Center and underpass
Smart-city Nerve Center inaugurated; Northern Bypass underpass construction started; 8,000-plant tree drive
- 2024-12Court stays plot cancellations
High court stopped cancellation of plots over unpaid additional development charges
- 2024-08Possession NOCs reset
Possession NOCs issued before 30 Aug 2024 cancelled; new ones valid 6 months
- 2024-05Commercial Zone A layout · Sector A
Revised Commercial Zone A map issued; zone development started 2024
- 2024-03Additional development charges
Letters demanded about 41% extra development charges from Phase 1 owners
- 2024Sector G completed · Sector G / G-1
Sector G development completed and inaugurated; private school campus opened
- 2023Sector Prism inaugurated · Sector Prism (D Prism)
Prism opened; fuel station operational
- 2022Sector G started; offices on site · Sector G / G-1
Sector G works began, DHA offices moved to site, Northern Bypass gate built, 5- and 10-marla houses built, Jamia Masjid opened
- 2021-12D Mall ballot
Computerised ballot for D Mall units held 31 Dec 2021
- 2021Prism and Commercial Zone B development · Sector Prism (D Prism)
Development of Sector Prism and Commercial Zone B started
- 2020Commercial launch · Nasir Bagh Commercial / Central Commercial District
Public launch of commercial plots; 4- and 8-marla commercial ballot results
- 2019First houses
1-kanal houses built; construction regulations issued Jul 2019
- 2018Development of A, B and C
Infrastructure work began in the first three sectors
- 2017Plot allotment ballot
Allotment balloting of residential plots
- 2016-05Urgent transfer service
Two-day urgent transfer started at extra charge
- 2016-03First computerised ballot
Phase I ballot held 4 Mar 2016; letters sent to successful applicants
- 2015-12Application window closes
Applications for 10-marla and 1-kanal plots collected through banks
