DHA Quetta
A smart city in the valley of Quetta.
DHA Quetta
Quetta, Balochistan · 12 phases and sectors
What is nearby
39 places in and around the society
- Grand Central ParkMain park, developed; Early Bird Sector A3 is the nearest sector
- Dancing FountainLit musical fountain inside Grand Central Park; described as the first in Balochistan
- Central Park JoylandRides for children inside Central Park; opened May 2026, 11 more rides planned by mid-Nov 2026
- DHA Quetta Zoo & Bird AviaryEarly Bird Sector A3 · Developed zoo and bird aviary
- DHA Quetta Safari ParkWildlife park under development with animal zones, jungle trails and eco huts
- Masjid-e-QubaMosque in the Early Bird sector for up to 1,000 worshippers, with a prayer area for women
- Sector A2 MosqueEarly Bird Sector A2 · First sector mosque, capacity 850; construction began Jan 2024
- Masjid-e-FatahEarly Bird Zarghoon · Second mosque, in Sector D, for 300 worshippers; groundbreaking Sep 2026
- Strike & DineBowling lanes and fast-food cafe in Hanna Mall 2; opened Jan 2025
- Hanna Mall food outletsSOHO Pan Asian Cuisine, Shaghf Coffee and Chaaye Khana (opened Sep 2026)
- KFC, OPTP and Tim Hortons (upcoming)Food brands signed MOUs in Jul 2026 to open outlets
- Chiltan Cricket GroundEarly Bird Sector A2 · International-standard cricket ground; opened Sep 2023, slots bookable
- Shahid Khan Afridi Sports ComplexPlanned sports complex and academy (MOU signed early 2024)
- JMartNeighbourhood grocery mart in Hanna Mall 2; opened Jan 2026
- 12 Commercial PlazasJinnah Expressway commercial (12 commercial plazas) · Mixed-use plazas (shops, offices, hotel, apartments); earth-breaking Apr 2026
- Solar ParkFirst solar power park of the society
- 132 kV Grid Station (planned)Planned grid station at Kuchlak on the N-25 (Samali area), with 10 MW supply and solar parks
- CSL Meta Robotics SchoolFirst school in DHA Quetta, robotics and AI focus; temporary container campus, permanent campus under construction (groundbreaking Apr 2026)
- International Standard Hospital (planned)Planned 300-bed hospital
- Hanna Mall 1 & 2Two completed commercial malls with power and 24/7 security; hold the hotel, cafes, mart and IT hub
- Security Operations CentreRuns 24/7 patrols, quick reaction forces and surveillance; perimeter wall and computerized entry
- Jinnah Entrance GateEarly Bird Sector A1 · Main entrance; most direct approach to Sector A1 from Jinnah Expressway
- Jinnah ExpresswayBroad main expressway linking the sectors and main landmarks; commercial plots front it
- Expressway 5 (Quaid-e-Millat Avenue)Road under development linking Grand Central Park to future residential sectors; commercial frontage in A2
- Iqbal Avenue (Expressway 02)Early Bird Sector A1 · Commercial plot frontage in Sector A1
- Best Western HotelHotel inside Hanna Mall 1
- 5 Star Hotel (planned)Planned five-star hotel in the centre of the society
- 44 Executive-Class VillasLuxury villa project in the Early Bird sector; groundbreaking Jul 2025
- Signature House Sector A1Early Bird Sector A1 · Model signature house; more signature houses under construction in A3
- +10 more
Utilities
Charges
As of the dates shown; ZN confirms current amounts
- Membership fee, residentialRs 35,000 (renewal Rs 12,000 per year)2024
- Membership fee, commercial or corporateRs 70,000 (commercial renewal Rs 24,000 per year)2024
- Transfer fee, residential (normal)Rs 15,000 (5 marla), Rs 24,000 (8 marla), Rs 30,000 (10 marla), Rs 48,000 (16 marla), Rs 52,000 (1 kanal), Rs 105,000 (2 kanal) as printed2024
- Transfer fee, commercial (normal)Rs 90,000 (4 marla), Rs 180,000 (8 marla), Rs 450,000 (1 kanal)2024
- Transfer fee, Early Bird commercial (earlier rate)Rs 45,000 (4 marla), Rs 90,000 (8 marla), Rs 225,000 (1 kanal)2023-03
- Urgent transfer feeRs 50,000 (individual), Rs 60,000 (corporate)2024
- Outstation transferRs 70,000 (individual), Rs 150,000 (corporate)2024
- Masjid fundRs 6,000 per marla for general members (non-Muslims exempt)2024
- Site plan and possession feeRs 20 per sq ft (residential), Rs 35 per sq ft (commercial); urgent site plan Rs 30,0002024
- Water connectionRs 140,000 per meter2024
- Electricity connectionRs 160,000 per meter2024
- Map (drawing) scrutiny feeRs 17 per sq ft (residential), Rs 25 per sq ft (commercial), individual owners2024
- Completion certificate feeRs 10,000 house (first owner); commercial Rs 40,000 up to 20,000 sq ft, Rs 125,000 above2024
- NOC feeRs 5,000 (urgent Rs 10,000)2024
Building rules
Key construction rules; ZN checks the latest rules for your plot before you build
5 to 8 marla (1,125-1,800 sq ft): 85% ground floor including car porch; first floor up to the ground-floor footprint.
8-10 marla (1,809-2,241 sq ft): 75% ground floor; 10-16 marla (2,250-3,591 sq ft): 70%; 16-24 marla (3,600-5,400 sq ft): 68%; above 32 marla (7,209 sq ft+): 60%, all including car porch.
For 10 marla and larger, first floor is limited to 90% of the ground floor including porch, or the ground-floor footprint less the car porch.
Front/rear/side setbacks: up to 8 marla 5/3/0/0 ft; 8-10 marla 7/3/3/0 ft; 10-16 marla 10/3/3/3 ft; 16-24 marla 15/5/5/5 ft; 24-32 marla 18/5/5/5 ft; above 32 marla 20/5/5/5 ft (first side setback is on the car porch side).
On 1 kanal and larger plots the front setback can be reduced by up to 2 ft on payment of regularization charges.
Houses: maximum two storeys (ground + first), counted from the reference road, and maximum 37 ft including water tank and mumty; 1 extra foot can be regularized for Rs 20,000 per ft, anything more is demolished.
Floor height must be between 8 ft 6 in and 16 ft.
Main commercial buildings: maximum 71 ft for basement + ground + 4, or 85 ft for basement + ground + 5; sector commercial: maximum 60 ft; larger commercial plots are approved case by case.
A basement deeper than 12 ft below road level needs RCC piling along all four sides of the plot, designed from a soil report and submitted with the plans; toilets in a basement must drain by pump.
Front/road boundary wall at most 8 ft 6 in above the road centre line; rear wall at most 6 ft above the rear road; at least 5 ft 6 in for privacy; a 2 ft 6 in safety grill (or approved electric fence) may go on top; no barbed wire on public-facing walls.
Boundary walls must be complete and plastered inside and out before applying for a completion certificate.
Construction must be finished within 3 years of building-plan approval; if demarcation is not taken within 3 months the plan must be revalidated (Rs 14,000).
If a building is not completed within 3 years of first drawing approval: Rs 2,000 per month (residential) or Rs 2 per sq ft per month (commercial); the penalty rate doubles in the fifth year.
Annual non-utilization charges on vacant plots apply 3 years after possession and not before January 2028 (not for service-benefit customers).
Steps: site plan (20 working days, 4 if urgent), drawing approval (20 working days residential, 45 commercial) with registered architect and structural engineer, soil test and 3D view, then demarcation within 5 days.
Building without approved drawings can be demolished at the owner's cost; fine Rs 30,000 for excavation or building without approval (Rs 100,000 for commercial without working drawings).
Issued within 30 days of request if no violations; occupation NOC within 10 days. If completion is not obtained within 90 days of submitting the completion plan: Rs 5,000 per month (residential) or Rs 2 per sq ft per month (commercial).
No commercial or semi-commercial activity in residential areas, including use as a mess, guest house or hostel; fine Rs 500,000 first time, Rs 700,000 second time, then utility disconnection.
Blasting is banned; boring for water is banned; underground and overhead water tanks are mandatory; no pump on the supply line; at most two electric meters per plot.
Open (barcode/affidavit) file trading was banned by public notice and holders told to get files allocated in their own names.
Timeline
Launches, ballots and possession announcements
- 2026-09Groundbreaking · Early Bird Zarghoon
Masjid-e-Fatah (300 worshippers) started in Sector D
- 2026-08Scheme
File Adjustment Scheme 2026 announced against development charges, plot price and LPS; ran 10 Sep-10 Oct 2026 with rates revised 17 Sep
- 2026-05Opening
Central Park Joyland rides opened
- 2026-04Groundbreaking · Jinnah Expressway commercial (12 commercial plazas)
Earth-breaking for 12 mixed-use commercial plazas
- 2026-04Groundbreaking
Permanent campus of the first school (robotics and AI) started
- 2025-07Groundbreaking
44 executive-class villas project started in the Early Bird sector
- 2024-10Charges revision
Revised plot feature charges took effect
- 2024-09Ballot · Sector A-6 (allocation files)
Mini location ballot allotted Sector A6 plots; A5 holders moved to Early Bird sectors
- 2024-07Ballot
Ballot for A5 file holders swapping into 1 kanal plots in Early Bird A1-A3
- 2024-05Ballot · Sector A-6 (allocation files)
Sector A6 location ballot for files with instalments cleared
- 2024-01Groundbreaking · Early Bird Sector A2
Work began on the first sector mosque (850 capacity)
- 2023-09Inauguration
Expressway reopened, 11 kV feeder energised and Chiltan Cricket Ground opened
- 2023-08Facility opening
Commercial testing lab inaugurated
- 2023-03Possession handover
Possession of Early Bird 1 kanal residential and 5 marla commercial plots handed over; building allowed
- 2023-03Ballot
Early Bird Commercial 2023 ballot (4 and 8 marla, 1 kanal commercial files)
- 2023-01Ballot
Location ballot for 1 kanal allocation files with dues cleared
- 2022-06Site office
Society operations moved to the new site office block
- 2022-04Notice
Open-file trading ban notice; files to be allocated in owners' names
- 2022-03Ballot
Location ballot for Early Bird 1 kanal and 5 marla marketing files
- 2021-03Court ruling
Supreme Court allowed DHA Quetta to develop schemes within its notified area