DHA Quetta

A smart city in the valley of Quetta.

All DHAs

DHA Quetta

Quetta, Balochistan · 12 phases and sectors

What is nearby

39 places in and around the society

Parks 5 Mosques 3 Food streets 3 Clubs 2 Markets 2 Grid stations 2 Schools 1 Hospitals 1 Malls 1 Police 1 Other places 18
Parks
  • Grand Central Park
    Main park, developed; Early Bird Sector A3 is the nearest sector
  • Dancing Fountain
    Lit musical fountain inside Grand Central Park; described as the first in Balochistan
  • Central Park Joyland
    Rides for children inside Central Park; opened May 2026, 11 more rides planned by mid-Nov 2026
  • DHA Quetta Zoo & Bird Aviary
    Early Bird Sector A3 · Developed zoo and bird aviary
  • DHA Quetta Safari Park
    Wildlife park under development with animal zones, jungle trails and eco huts
Mosques
  • Masjid-e-Quba
    Mosque in the Early Bird sector for up to 1,000 worshippers, with a prayer area for women
  • Sector A2 Mosque
    Early Bird Sector A2 · First sector mosque, capacity 850; construction began Jan 2024
  • Masjid-e-Fatah
    Early Bird Zarghoon · Second mosque, in Sector D, for 300 worshippers; groundbreaking Sep 2026
Food streets
  • Strike & Dine
    Bowling lanes and fast-food cafe in Hanna Mall 2; opened Jan 2025
  • Hanna Mall food outlets
    SOHO Pan Asian Cuisine, Shaghf Coffee and Chaaye Khana (opened Sep 2026)
  • KFC, OPTP and Tim Hortons (upcoming)
    Food brands signed MOUs in Jul 2026 to open outlets
Clubs
  • Chiltan Cricket Ground
    Early Bird Sector A2 · International-standard cricket ground; opened Sep 2023, slots bookable
  • Shahid Khan Afridi Sports Complex
    Planned sports complex and academy (MOU signed early 2024)
Markets
  • JMart
    Neighbourhood grocery mart in Hanna Mall 2; opened Jan 2026
  • 12 Commercial Plazas
    Jinnah Expressway commercial (12 commercial plazas) · Mixed-use plazas (shops, offices, hotel, apartments); earth-breaking Apr 2026
Grid stations
  • Solar Park
    First solar power park of the society
  • 132 kV Grid Station (planned)
    Planned grid station at Kuchlak on the N-25 (Samali area), with 10 MW supply and solar parks
Schools
  • CSL Meta Robotics School
    First school in DHA Quetta, robotics and AI focus; temporary container campus, permanent campus under construction (groundbreaking Apr 2026)
Hospitals
  • International Standard Hospital (planned)
    Planned 300-bed hospital
Malls
  • Hanna Mall 1 & 2
    Two completed commercial malls with power and 24/7 security; hold the hotel, cafes, mart and IT hub
Police
  • Security Operations Centre
    Runs 24/7 patrols, quick reaction forces and surveillance; perimeter wall and computerized entry
Other places
  • Jinnah Entrance Gate
    Early Bird Sector A1 · Main entrance; most direct approach to Sector A1 from Jinnah Expressway
  • Jinnah Expressway
    Broad main expressway linking the sectors and main landmarks; commercial plots front it
  • Expressway 5 (Quaid-e-Millat Avenue)
    Road under development linking Grand Central Park to future residential sectors; commercial frontage in A2
  • Iqbal Avenue (Expressway 02)
    Early Bird Sector A1 · Commercial plot frontage in Sector A1
  • Best Western Hotel
    Hotel inside Hanna Mall 1
  • 5 Star Hotel (planned)
    Planned five-star hotel in the centre of the society
  • 44 Executive-Class Villas
    Luxury villa project in the Early Bird sector; groundbreaking Jul 2025
  • Signature House Sector A1
    Early Bird Sector A1 · Model signature house; more signature houses under construction in A3
  • +10 more

Utilities

Electricity
QESCO
Connections through the DHA office or nearby QESCO sub-division; 11 kV feeder since 2023; 132 kV grid station and solar parks planned
Gas
SNGPL (as named in DHA bylaws)
Gas meters through the gas utility; DHA plans its own SNG plant (LPG to piped gas)
Water
DHA own
One connection per building; tanks mandatory; free bowser on supply breakdown; boring banned
Sewerage
DHA own
WC waste via RCC septic tank into DHA manholes; rainwater kept out of sewers
Security
DHA own
24/7 patrols, quick reaction forces, operations centre, perimeter wall and computerized entry
Garbage
DHA own
Collected by DHA administration from dustbins outside shops

Charges

As of the dates shown; ZN confirms current amounts

  • Membership fee, residentialRs 35,000 (renewal Rs 12,000 per year)2024
  • Membership fee, commercial or corporateRs 70,000 (commercial renewal Rs 24,000 per year)2024
  • Transfer fee, residential (normal)Rs 15,000 (5 marla), Rs 24,000 (8 marla), Rs 30,000 (10 marla), Rs 48,000 (16 marla), Rs 52,000 (1 kanal), Rs 105,000 (2 kanal) as printed2024
  • Transfer fee, commercial (normal)Rs 90,000 (4 marla), Rs 180,000 (8 marla), Rs 450,000 (1 kanal)2024
  • Transfer fee, Early Bird commercial (earlier rate)Rs 45,000 (4 marla), Rs 90,000 (8 marla), Rs 225,000 (1 kanal)2023-03
  • Urgent transfer feeRs 50,000 (individual), Rs 60,000 (corporate)2024
  • Outstation transferRs 70,000 (individual), Rs 150,000 (corporate)2024
  • Masjid fundRs 6,000 per marla for general members (non-Muslims exempt)2024
  • Site plan and possession feeRs 20 per sq ft (residential), Rs 35 per sq ft (commercial); urgent site plan Rs 30,0002024
  • Water connectionRs 140,000 per meter2024
  • Electricity connectionRs 160,000 per meter2024
  • Map (drawing) scrutiny feeRs 17 per sq ft (residential), Rs 25 per sq ft (commercial), individual owners2024
  • Completion certificate feeRs 10,000 house (first owner); commercial Rs 40,000 up to 20,000 sq ft, Rs 125,000 above2024
  • NOC feeRs 5,000 (urgent Rs 10,000)2024

Building rules

Key construction rules; ZN checks the latest rules for your plot before you build

Covered area2024

5 to 8 marla (1,125-1,800 sq ft): 85% ground floor including car porch; first floor up to the ground-floor footprint.

Covered area2024

8-10 marla (1,809-2,241 sq ft): 75% ground floor; 10-16 marla (2,250-3,591 sq ft): 70%; 16-24 marla (3,600-5,400 sq ft): 68%; above 32 marla (7,209 sq ft+): 60%, all including car porch.

Covered area2024

For 10 marla and larger, first floor is limited to 90% of the ground floor including porch, or the ground-floor footprint less the car porch.

Setbacks2024

Front/rear/side setbacks: up to 8 marla 5/3/0/0 ft; 8-10 marla 7/3/3/0 ft; 10-16 marla 10/3/3/3 ft; 16-24 marla 15/5/5/5 ft; 24-32 marla 18/5/5/5 ft; above 32 marla 20/5/5/5 ft (first side setback is on the car porch side).

Setbacks2024

On 1 kanal and larger plots the front setback can be reduced by up to 2 ft on payment of regularization charges.

Height2024

Houses: maximum two storeys (ground + first), counted from the reference road, and maximum 37 ft including water tank and mumty; 1 extra foot can be regularized for Rs 20,000 per ft, anything more is demolished.

Height2024

Floor height must be between 8 ft 6 in and 16 ft.

Height2024

Main commercial buildings: maximum 71 ft for basement + ground + 4, or 85 ft for basement + ground + 5; sector commercial: maximum 60 ft; larger commercial plots are approved case by case.

Basement2024

A basement deeper than 12 ft below road level needs RCC piling along all four sides of the plot, designed from a soil report and submitted with the plans; toilets in a basement must drain by pump.

Boundary wall2024

Front/road boundary wall at most 8 ft 6 in above the road centre line; rear wall at most 6 ft above the rear road; at least 5 ft 6 in for privacy; a 2 ft 6 in safety grill (or approved electric fence) may go on top; no barbed wire on public-facing walls.

Boundary wall2024

Boundary walls must be complete and plastered inside and out before applying for a completion certificate.

Construction period2024

Construction must be finished within 3 years of building-plan approval; if demarcation is not taken within 3 months the plan must be revalidated (Rs 14,000).

Non-construction penalty2024

If a building is not completed within 3 years of first drawing approval: Rs 2,000 per month (residential) or Rs 2 per sq ft per month (commercial); the penalty rate doubles in the fifth year.

Non-construction penalty2024

Annual non-utilization charges on vacant plots apply 3 years after possession and not before January 2028 (not for service-benefit customers).

Map approval2024

Steps: site plan (20 working days, 4 if urgent), drawing approval (20 working days residential, 45 commercial) with registered architect and structural engineer, soil test and 3D view, then demarcation within 5 days.

Map approval2024

Building without approved drawings can be demolished at the owner's cost; fine Rs 30,000 for excavation or building without approval (Rs 100,000 for commercial without working drawings).

Completion certificate2024

Issued within 30 days of request if no violations; occupation NOC within 10 days. If completion is not obtained within 90 days of submitting the completion plan: Rs 5,000 per month (residential) or Rs 2 per sq ft per month (commercial).

Commercial use2024

No commercial or semi-commercial activity in residential areas, including use as a mess, guest house or hostel; fine Rs 500,000 first time, Rs 700,000 second time, then utility disconnection.

Other2024

Blasting is banned; boring for water is banned; underground and overhead water tanks are mandatory; no pump on the supply line; at most two electric meters per plot.

Other2022-04

Open (barcode/affidavit) file trading was banned by public notice and holders told to get files allocated in their own names.

Timeline

Launches, ballots and possession announcements

  1. 2026-09
    Groundbreaking · Early Bird Zarghoon

    Masjid-e-Fatah (300 worshippers) started in Sector D

  2. 2026-08
    Scheme

    File Adjustment Scheme 2026 announced against development charges, plot price and LPS; ran 10 Sep-10 Oct 2026 with rates revised 17 Sep

  3. 2026-05
    Opening

    Central Park Joyland rides opened

  4. 2026-04
    Groundbreaking · Jinnah Expressway commercial (12 commercial plazas)

    Earth-breaking for 12 mixed-use commercial plazas

  5. 2026-04
    Groundbreaking

    Permanent campus of the first school (robotics and AI) started

  6. 2025-07
    Groundbreaking

    44 executive-class villas project started in the Early Bird sector

  7. 2024-10
    Charges revision

    Revised plot feature charges took effect

  8. 2024-09
    Ballot · Sector A-6 (allocation files)

    Mini location ballot allotted Sector A6 plots; A5 holders moved to Early Bird sectors

  9. 2024-07
    Ballot

    Ballot for A5 file holders swapping into 1 kanal plots in Early Bird A1-A3

  10. 2024-05
    Ballot · Sector A-6 (allocation files)

    Sector A6 location ballot for files with instalments cleared

  11. 2024-01
    Groundbreaking · Early Bird Sector A2

    Work began on the first sector mosque (850 capacity)

  12. 2023-09
    Inauguration

    Expressway reopened, 11 kV feeder energised and Chiltan Cricket Ground opened

  13. 2023-08
    Facility opening

    Commercial testing lab inaugurated

  14. 2023-03
    Possession handover

    Possession of Early Bird 1 kanal residential and 5 marla commercial plots handed over; building allowed

  15. 2023-03
    Ballot

    Early Bird Commercial 2023 ballot (4 and 8 marla, 1 kanal commercial files)

  16. 2023-01
    Ballot

    Location ballot for 1 kanal allocation files with dues cleared

  17. 2022-06
    Site office

    Society operations moved to the new site office block

  18. 2022-04
    Notice

    Open-file trading ban notice; files to be allocated in owners' names

  19. 2022-03
    Ballot

    Location ballot for Early Bird 1 kanal and 5 marla marketing files

  20. 2021-03
    Court ruling

    Supreme Court allowed DHA Quetta to develop schemes within its notified area